
|
Material is loaded onto the decoiler while the computer
sets up the m/c for the production run. |
 |
Parts are roll formed labelled and cut to size - minimising
waste. |
| |

|
Truss layouts also detail truss centre positions. |
 |
Rivets are inserted in place and pneumatically riveted. |
| |

|
Once in position the dimples engage. |
 |
As we explain on pg12 of our manual webs and studs are
twisted into position and tapped into place. |
| |

|
For larger span trusses gusset plates are specified
by our engineering to strengthen the truss load point. |
 |
Buildings are designed in our office to suit your plans. |
| |

|
Squaring jigs are used for frames to keep them square
while strap bracing is applied. |
 |
Trusses and frames are arranged in packs for transport. |
| |

|
Generally we use trucks with hyab type cranes to minimise
handling - this is same 320sq m house on truck. |
 |
Collection of Trusses ready for construction. |
| |

|
Frames and Trusses assembled to create the final product. |
|
|
| |